Salvesen

Aldaia

2017

Build

1.250 m2

Office square meters

80 m2

Construction duration

4 months

Adaptation of an open-air yard previously used as an outdoor storage area into a dry logistics warehouse connected to the main cold chamber’s dairy distribution hub. The project includes enclosures, roofing, installations, loading dock areas, as well as a workshop and office space.
Fachada de centro logístico con rótulo Salvesen Logistics y zona de carga.

Property owner

Salvesen

Engineering

CUBIC

Pasillo interior con divisiones y acabados en panel sandwich.
Interior de nave con acceso de camiones y puertas seccionales elevadas.
Vista superior de cubierta metálica blanca en una nave industrial.
Muelles de carga exteriores de una nave logística.

More projects.