P3

Quer, Guadalajara

2018

Build

1.870 m2

Construction duration

5 months

Construction of an annex warehouse attached to the existing building at its northwest corner, allowing the creation of a dedicated Battery Charging Room for all the machinery used in the warehouse. Structure and enclosures based on a prefabricated concrete structure, with a jointless floor slab, and designed to meet fire protection (PCI) regulations, with the battery room built to the highest standards.

Property owner

P3 Parks

Engineering

4M

More projects.

Palol de Revardit, Girona
2025
Cornellà de Llobregat, Barcelona
2025
El Pla de Santa Maria, Tarragona
2020