Salvesen

Aldaia

2017

Build

1.250 m2

Office square meters

80 m2

Construction duration

4 months

Adaptation of an open-air yard previously used as an outdoor storage area into a dry logistics warehouse connected to the main cold chamber’s dairy distribution hub. The project includes enclosures, roofing, installations, loading dock areas, as well as a workshop and office space.
Fachada de centro logístico con rótulo Salvesen Logistics y zona de carga.

Property owner

Salvesen

Engineering

CUBIC

Pasillo interior con divisiones y acabados en panel sandwich.
Interior de nave con acceso de camiones y puertas seccionales elevadas.
Vista superior de cubierta metálica blanca en una nave industrial.
Muelles de carga exteriores de una nave logística.

More projects.

Palol de Revardit, Girona
2025
Cornellà de Llobregat, Barcelona
2025

P3

Quer, Guadalajara
2018