Mileway

Getafe, Madrid

2023

Build

10.100 m2

Office square meters

1.375 m2

Construction duration

4 months

Adaptation of an unused logistics warehouse. Roof repair, replacement of polycarbonate skylights, installation of a new externally located elevator with architectural enclosures and finishes, floor slab repair, upgrading of the fire protection system, replacement of the HVAC system, replacement of LED lighting fixtures in the warehouse, and the adaptation and modernization of offices and changing rooms, as well as the external areas.

Property owner

Mileway

Engineering

AGP