EQT Exeter

El Pla de Santa Maria, Tarragona

2021

Build

9.800 m2

Office square meters

200 m2

Construction duration

4 months

Adaptation of a logistics warehouse to fire protection (PCI) regulations, including the extension of a previously unused area, applying a performance-based approach to optimize the fire protection system. Rehabilitation of the office area and the external yard, installation of lighting in the warehouse and workshop, and refurbishment of the interior floor slab, the warehouse roof, and the smoke vents (exutories).

Property owner

Exeter

Engineering

CUBIC

More projects.

Palol de Revardit, Girona
2025
Cornellà de Llobregat, Barcelona
2025

P3

Quer, Guadalajara
2018